首页> 外文期刊>Engineering Optimization >Research on common due window assignment flowshop scheduling with learning effect and resource allocation
【24h】

Research on common due window assignment flowshop scheduling with learning effect and resource allocation

机译:与学习效应和资源分配共同到期窗口分配流程调度的研究

获取原文
获取原文并翻译 | 示例
           

摘要

In this article, the two-machine no-wait permutation flowshop scheduling problem with common due window assignment, learning effect and resource allocation is considered, wherein learning effect and resource allocation mean that the processing time of a job is a function of its position in a sequence and its amount of resource allocation. According to the common due window assignment method, each job is associated with a common due window, which is a decision variable. The goal is to determine the sequence of jobs, common due window starting time, due window size and resource allocation such that the linear weighted sum of job earliness, tardiness, due window size and resource cost is minimized. This article shows that the scheduling problem can be solved in polynomial time.
机译:在本文中,考虑了具有共同的窗口分配,学习效果和资源分配的双机无等待置换流程调度问题,其中学习效果和资源分配意味着作业的处理时间是其位置的函数 序列及其资源分配量。 根据公共到期窗口分配方法,每个作业与一个共同的到期窗口相关联,这是一个决策变量。 目标是确定作业的序列,共同的窗口开始时间,到期窗口大小和资源分配,使得线性加权的作业和最小化,迟到,到期窗口大小和资源成本最小化。 本文表明,在多项式时间中可以解决调度问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号