...
首页> 外文期刊>Energy World >Replacing 45-year-old boiler feed pumps at waste-to-energy plant
【24h】

Replacing 45-year-old boiler feed pumps at waste-to-energy plant

机译:在废物到能量厂中取代45岁的锅炉供给泵

获取原文
获取原文并翻译 | 示例
           

摘要

A UK waste-to-energy plant experiencing considerable reliability issues with its six aging boiler feedwater pumps has had the problem solved bySulzer. Power plants rely on boiler feed pumps to deliver a reliable and consistent flow of water to the boilers, which create the steam that powers the turbine. The plant has six boiler feed pumps that have been operating since the site was commissioned over 45 years ago. Over the years, the pumps have been regularly maintained, but more recently, they have required major refurbishments to keep them operational. Indeed, routine maintenance of the pumps involved a complete refurbishment every two years and the costs for this work were increasing.
机译:英国废弃能源厂与其六位老化锅炉给水泵有相当的可靠性问题,已经解决了Butsulzer的问题。 发电厂依赖于锅炉供给泵,为锅炉提供可靠和一致的水流,从而产生为涡轮机供电的蒸汽。 该工厂拥有六种锅炉供给泵,自该部位在45年前委托以来一直在运营。 多年来,泵经常维持,但最近,他们需要重新翻新,以使他们保持运营。 实际上,泵的日常维护涉及每两年完全翻新,这项工作的成本正在增加。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号