首页> 外文期刊>Ecological restoration >Single-machine scheduling problem with fuzzy time delays and mixed precedence constraints
【24h】

Single-machine scheduling problem with fuzzy time delays and mixed precedence constraints

机译:模糊时间延迟和混合优先约束的单机调度问题

获取原文
获取原文并翻译 | 示例
           

摘要

In this paper, we study the single-machine scheduling problem and obtain some new results on the special time-delay structure and mixed precedence constraints. We first demonstrate the complexity of the ordinary problem under different circumstances and obtain two cases, namely a polynomial solvable case and an NP-complete case. Then, we present a fuzzy extension of the ordinary problem, based on which a representation of the non-dominated solutions is given for the fuzzy scheduling problem. Finally, we demonstrate the complexity of fuzzy extension problems under different time delays by proposing corresponding algorithms.
机译:在本文中,我们研究了单机调度问题,并在特殊时延结构和混合优先约束上获取一些新结果。 我们首先在不同情况下展示普通问题的复杂性,并获得两种情况,即多项式可溶性案例和NP完整案例。 然后,我们提出了普通问题的模糊延伸,基于该模糊延伸,基于哪个非主导解决方案的表示用于模糊调度问题。 最后,我们通过提出相应的算法来展示不同时间延迟下模糊延伸问题的复杂性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号