【24h】

A slick solution

机译:一个光滑的解决方案

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

A rigless slickline ESP deployment proves to be a success for a Middle East operator. It is more important than ever to reduce the frequency and extent of workover operations whenever possible. Pulling a failed electric submersible pump (ESP) requires a heavy workover, and with the ongoing challenge of rig availability, especially in the Middle East, operators are looking for ways to avoid or minimize the occasions that a rig is required. Typically, replacing an ESP involves taking a rig that is drilling and halting the drilling program to pull the broken ESP. ESP-related production downtime is a common and costly problem. Consequently, some operators are investing significant time and resources in investigating ways of reducing the revenues lost when changing out their ESPs. Some goals operators are working toward are obtaining ESPs with a 10-year life cycle and ESP replacements that can be started and completed in only one day.
机译:严格的Slickline ESP部署证明是中东运营商的成功。 可以比以往任何时候都更重要,以减少尽可能减少工作组运营的频率和程度。 拉动失败的电动潜水泵(ESP)需要沉重的工作服,并且在钻机可用性的持续挑战中,特别是在中东,运营商正在寻找避免或最小化需要钻机的场合。 通常,更换ESP涉及采用钻井平台,该钻机钻孔并停止钻井计划以拉动断开ESP。 ESP相关的生产停机时间是一个共同且昂贵的问题。 因此,一些运营商正在投资重要的时间和资源,调查减少损失时损失的措施。 一些目标运营商正在努力获得具有10年的生命周期和ESP更换的ESP,只能在一天内启动和完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号