...
首页> 外文期刊>International Journal of Rock Mechanics and Mining Sciences >Dynamic model validation using blast vibration monitoring in mine backfill
【24h】

Dynamic model validation using blast vibration monitoring in mine backfill

机译:矿井回填中爆震监测的动态模型验证

获取原文
获取原文并翻译 | 示例
           

摘要

Sublevel stoping mining methods with delayed backfill are employed for mining steeply dipping ore deposits at deeper horizons. Cemented rockfill (CRF) is used as a backfilling material for open stopes formed during mining. In primary-secondary mining sequence, blast vibrations are induced in CRF during the extraction of adjacent stopes. Higher magnitude of blast vibrations may destabilize CRF causing failure and dilution of precious ore. This paper presents a methodology for calibrating a FLAC3D numerical model, encompassing mine backfill with blast-induced vibration data recorded from field instrumentation. Two FLAC3D models are prepared, one for simulating the blasting process and the other is prepared for backfill stability analysis. The first model resulted in load vectors to be applied to backfill and rock interface. The second model showed that the backfill fails under the blast vibrations induced by the adjacent production stope. The results of the back analysis of fill failure are presented and discussed. The methodology may serve as numerical model calibration procedure for mine backfill.
机译:Sublevel停止延迟回填的采矿方法用于在更深的视野下采矿陡峭浸渍矿床沉积物。粘合堆石(CRF)用作在采矿过程中形成的开口停止的回填材料。在初级 - 二级采矿序列中,在邻近止动件的提取期间在CRF中诱导BLAST振动。爆炸振动的较高幅度可能使CRF引起珍贵矿石的失效和稀释性稳定。本文提出了一种校准FLAC3D数值模型的方法,包括从现场仪器记录的爆炸诱导的振动数据的矿井回填。制备了两个FLAC3D型号,用于模拟爆破过程,另一个是为回填稳定性分析制备的。第一种模型导致负载向量应用于回填和岩石界面。第二种模型表明,回填在相邻生产迹象引起的爆炸振动下失效。提出和讨论了填充失败的背面分析的结果。该方法可以作为矿井回填的数值模型校准程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号