...
首页> 外文期刊>International Journal of Agriculture, Environment and Biotechnology >Study on Scope of Roof Top Water Harvesting for Recharging Ground Water for Combating Excess Ground Water Withdrawal for Rice Cultivation in the District of Nadia in West Bengal
【24h】

Study on Scope of Roof Top Water Harvesting for Recharging Ground Water for Combating Excess Ground Water Withdrawal for Rice Cultivation in the District of Nadia in West Bengal

机译:在西孟加拉邦纳迪亚地区对水稻种植过剩地下水充电地下水的屋顶蓄水范围研究

获取原文
获取原文并翻译 | 示例
           

摘要

Investigation was conducted for all the blocks in the district of Nadia, West Bengal to estimate the over exploitation of ground water and to examine the possibility of mitigation of it through artificial ground water recharge. There were approximately 1.16 * 109m3 irrigation water requirement except monsoon month (June to September) for rice cultivation. The estimated ground water recharge was found approximately 0.82 x 109m3. Thus, approximately 0.34 * 109 m3 of ground water was found over exploited every year if irrigation demands entirely satisfied through ground water. This 0.34 -109 m3 of overexploitation could be mitigated if approximately 3.88 - 108m2roof top water harvesting structure along with the recharge facilities were created. The estimated cost for this purpose was approximately ^ 666.488 billion. The creation of this facility may also contribute to large extent in domestic water supply along with the improvement of arsenic contaminated ground water of this district.
机译:在纳迪亚地区的所有街区进行了调查,西孟加拉邦通过人工地下水补给来估计对地下水的剥削并审查它的可能性。 除了季风月(6月至9月)以进行大约1.16 * 109M3灌溉用水要求进行水稻培养。 估计的地面水充电发现约0.82×109m3。 因此,如果通过地面水完全满足灌溉需求,每年发现大约0.34×109m3的地下水。 如果大约3.88-108m2ROOF的热量收获结构以及充电设施,则可以减轻0.34 -109 m3的过度伸展。 此目的的估计成本约为^ 666.48.8亿。 该设施的创造也可能在很大程度上在国内供水方面随着该地区的砷污染地下水的改善而导致的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号