...
首页> 外文期刊>Argus global LNG >SLNG considers adding fifth storage tank
【24h】

SLNG considers adding fifth storage tank

机译:SLNG考虑添加第五储罐

获取原文
获取原文并翻译 | 示例
           

摘要

The Singapore LNG (SLNG) terminal on Jurong island is considering building a fifth LNG storage tank and will shortly issue a non-binding proposal to gauge market interest, especially for long-term leases. "As part of our continuing efforts to facilitate the development of Singapore as an LNG hub, SLNG will be issuing a non-binding expression of interest [EOI] later this year or early next year for a potential fifth LNG storage tank," SLNG says. The response from the EOI will determine whether the fifth tank goes ahead.
机译:裕廊岛上的新加坡LNG(SLNG)终端正在考虑建立第五型液化天然气储罐,并将尽快发出无限制的建议,以衡量市场兴趣,特别是对于长期租赁。 “作为促进新加坡发展作为液化天然气枢纽的持续努力的一部分,SLNG将在今年晚些时候或明年年初发出一个不合格的兴趣表达[EOI]或为潜在的第五天液储存坦克来说,” 。 来自EOI的响应将确定第五款是否前进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号