首页> 外文期刊>Arabian journal of geosciences >Experimental study on excavating strip coal pillars using caving zone backfill technology
【24h】

Experimental study on excavating strip coal pillars using caving zone backfill technology

机译:采用塌陷区回填技术挖掘带煤柱的实验研究

获取原文
获取原文并翻译 | 示例
           

摘要

Strip mining was the major method to control surface subsidence when mining under buildings in China; however, its coal recovery ratio was only 30 to 50%, resulting in a large amount of coal resource waste due to the retained strip coal pillars. As such, it is of important significance to recover the retained pillars while guarantee the safety of the buildings at surface. In order to address this issue, excavating strip coal pillars using caving zone backfill technology was proposed in this study. The process of this technology was to grouting backfill the original strip caving zones using high-water content material at first, creating a combined backfill body of caved gangue and high-water content material, the backfill body acted as the temporary support. Then the retained pillars were excavated and the newly produced caving zones were backfilled with one interval, which effectively prevented the movement and deformation of the strata. The backfilling system and technology were designed and trailed to excavate the retained pillars at mining area 911 in Bucun colliery. It was found that the backfilling rate reached 96.8 to 98.7% in the original caving zones, the backfilling body in caving zones was highly compacted, and the maximum surface subsidence was only increased to 67mm with no growth in the failure depth of floor. The retained coal pillars in three of the mining areas were safely excavated and the safety of buildings on the ground was preserved.
机译:条带采矿是在中国建筑物下采矿时控制表面沉降的主要方法;然而,其煤炭回收率仅为30%至50%,导致由于保留的带状煤柱导致大量的煤炭资源浪费。因此,恢复保留的柱是重要的重要意义,同时保证了建筑物在表面的安全性。为了解决这个问题,在这项研究中提出了使用塌陷区回填技术的挖掘带煤柱。这项技术的过程首先使用高水含量材料灌浆回填原始条带塌陷区,采用塌陷煤矸石和高水含量材料的组合回填体,回填体用作临时支撑。然后挖掘保留的柱,并用一个间隔回填新产生的塌陷区,从而有效地防止了地层的运动和变形。设计并落后的回填系统和技术挖掘了勃敦煤矿矿区911的保留柱。结果发现,原始塌陷区的回填率达到96.8至98.7%,塌陷区的回填体具有高度压实,最大表面沉降仅增加到67毫米,地板的故障深度没有增长。安全挖掘了三个采矿区的保留煤支柱,并保留了地面上的建筑物的安全性。

著录项

  • 来源
    《Arabian journal of geosciences》 |2018年第18期|共14页
  • 作者单位

    China Univ Min &

    Technol Key Lab Deep Coal Resource Min Minist Educ China Sch Mines Xuzhou 221116 Jiangsu Peoples R China;

    China Univ Min &

    Technol Key Lab Deep Coal Resource Min Minist Educ China Sch Mines Xuzhou 221116 Jiangsu Peoples R China;

    China Univ Min &

    Technol Key Lab Deep Coal Resource Min Minist Educ China Sch Mines Xuzhou 221116 Jiangsu Peoples R China;

    Univ Wollongong Sch Civil Min &

    Environm Engn Wollongong NSW 2522 Australia;

    China Univ Min &

    Technol State Key Lab Coal Resources &

    Safe Min Xuzhou 221116 Jiangsu Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 地质学;
  • 关键词

    Strip mining; Caving zone backfill; Strip coal pillar; Surface subsidence; Green mining;

    机译:剥离采矿;塌陷区回填;条带煤柱;表面沉降;绿色矿业;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号