首页> 外文期刊>Africa oil and gas: Breaking news and analysis from Africa >Total issues formal invites for Angolan ACCE tie-back
【24h】

Total issues formal invites for Angolan ACCE tie-back

机译:Angolan Acce Rice的全面问题正式邀请

获取原文
获取原文并翻译 | 示例
       

摘要

Total has formally invited bids as it kicks off the ACCE tie-back project in Block 32 off Angola. As previously revealed by AOG (see 30 August 2018), the company has been talking to all the major subsea contractors for some time, but it has now issued the formal invitation for front end engineering and EPCI for the tie-back project involving the subsea production system, SURF and topsides modifications. Interest is due in by next Friday - March 15th.
机译:总共邀请投标,因为它在安哥拉关闭32块中启动了acce铁路项目。 正如以前透露的aog(见2018年8月30日),公司一直在与所有主要的海底承包商交谈一段时间,但它现已发出正式邀请前端工程和EPCI邀请涉及海底的铁路后项目 生产系统,冲浪和顶部修改。 利息将于下周五至15日到期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号