【24h】

Nigeria approves Total Ikike contract

机译:尼日利亚的猫总授权合同

获取原文
获取原文并翻译 | 示例
           

摘要

The Nigerian authorities have approved the award for the major contract for the shallow water Ikike platform project although operator Total appears to be delaying the final step.As previously revealed by AOG,Total finally proceeded with commercial tenders last November after lengthy delays to what was originally to be a fast-track project.When tenders first appeared in September 2017 the French major said it hoped to lock in low pricing and gain approval before the presidential elections in February.Total split the project into four main contracts: construction of jacket and topside,brownfield modification and integration works,SURF and platform installation and finally the instrumentation and safety control systems.The most expensive of the four was the SURF deal.Four bidders passed the technical evaluation phase: Deltatek,Sapura,Micoperi and Nigerstar 7.Their prices arrived in that order although NNPC was still concerned about the Deltatek offer and went back on several occasions to try and get an extra discount.
机译:尼日利亚当局已经批准了浅水浅水普通合同奖,尽管运营商总计似乎延迟了最后一步。以前透露的最终步骤,最终终于在漫长的延迟延长到最初的商业招标后成为一个快速的项目。在2017年9月首次出现的招标时,法国专家称,它希望在2月的总统选举之前锁定低价并获得批准.Total将该项目分为四个主要合同:夹克和顶部的建造,布朗菲尔德修改和集成工程,冲浪和平台安装,最后仪表和安全控制系统。四个最昂贵的四个是海浪交易。投标人通过了技术评估阶段:Deltatek,Sapura,Micoperi和Nigerstar 7.Their价格虽然NNPC仍然担心Deltatek优惠,但仍然担心该订单,并若要多次尝试获得额外的折扣。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号