【24h】

Stop start for Shell's Nigerian HA

机译:停止开始壳的尼日利亚哈

获取原文
获取原文并翻译 | 示例
       

摘要

Just when it appeared that Shell's HA project off Nigeria was finally about to progress the operator has put the brakes on again. As previously revealed by AOG, after a series of delays the six remaining consortia were due to submit their updated concept reports last Friday - July 31~(st). Shortly before this date Shell contacted the groupings to let them know that this too had been shifted and that they will be told of the new timetable later.
机译:就在似乎贝壳的HA Project off尼日利亚最终进展,运营商再次刹车。 正如以前透露的AOG,在一系列延迟延误后,剩下的六个联盟是由于上周五提交他们更新的概念报告 - 7月31日〜(ST)。 在此日期外壳之前不久,联系了分组,让他们知道这也被转移,并将在以后被告知新时间表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号