...
首页> 外文期刊>Africa oil and gas: Breaking news and analysis from Africa >BP readies second Senegal well as Kosmos bids due in
【24h】

BP readies second Senegal well as Kosmos bids due in

机译:BP夺得第二个塞内加尔,因为Kosmos出价到期

获取原文
获取原文并翻译 | 示例
           

摘要

BP and Kosmos are ready to drill an appraisal well at their second gas hub off Senegal and Mauritania after successfully completing a well on the Greater Tortue field. The companies have the Ensco DS-12 rig for three firm wells including the well on Tortue, an appraisal on Yakaar Teranga and then an exploration well at Orca. In the meantime Kosmos said bids for another 20 per cent of its holding in the acreage are due in shortly with "considerable" interest.
机译:BP和Kosmos准备好在他们的第二个气体枢纽钻探塞内加尔和毛里塔尼亚,在成功地完成了较大的侵权行道。 本公司拥有恩科公司DS-12钻机,包括三大井,包括易于侵权,这是雅克萨尔特兰加的评估,然后在Orca探索。 与此同时,Kosmos表示,在不久以“相当大”的兴趣不久的情况下,举办的20%的持有人的投标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号