首页> 外文期刊>Concrete in Australia >MEDALLION W NNER Brooklyn Trunk Sewer BTS001 Rehabiltiation -Design, Construct and Commissioning
【24h】

MEDALLION W NNER Brooklyn Trunk Sewer BTS001 Rehabiltiation -Design, Construct and Commissioning

机译:Medallion W nner Brooklyn Trunk下水道BTS001 Rehabortiation -Design,构建和调试

获取原文
获取原文并翻译 | 示例
           

摘要

John Holland-KBR Joint Venture engaged EYWAD Pty Ltd to undertake the structural rehabilitation and upgrade works to the 53 year old, 45 metre deep, 6.7 m diameter concrete sewer shaft, at Melbourne Water's Brooklyn Pumping Station. The Brooklyn shaft to be rehabilitated is the last downstream manhole located on the Brooklyn Trunk Sewer system, positioned immediately before sewage flows are divided to either the north or south pump wells at the Brooklyn Pumping Station. The shaft is located within the Melbourne Water Brooklyn Pumping Station at the rear western boundary of the site.
机译:John Holland-KBR合资企业聘请Eywad Pty Ltd承接结构康复和升级为53岁,深度深度,6.7米直径的混凝土下水道轴,在墨尔本水的布鲁克林泵站。 待恢复的布鲁克林轴是位于布鲁克林干线下水道系统上的最后一个下游人物,在污水流量分为布鲁克林泵站的北方或南泵井之前立即定位。 轴位于墨尔本水布鲁克林泵站内,位于现场后部南部边界。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号