...
首页> 外文期刊>Coal Age >Ramaco Develops Alternative Plan at Berwind Mine
【24h】

Ramaco Develops Alternative Plan at Berwind Mine

机译:Ramaco在Berwind矿区发展替代计划

获取原文
获取原文并翻译 | 示例
           

摘要

After new exploratory drilling at the Berwind mine, Ramaco Resources has further defined the extent of a sandstone intrusion and has implemented an alternative plan to mine around it and ramp up into the Pocahontas No. 4 seam. The company said it will continue to mine in an alternate path through the Pocahontas No. 3 Seam at an expected annualized rate of about 200,000 tons per year (tpy). These development tons are expected to be sold at current pricing levels into the low volatile metallurgical market.
机译:在Berwind矿井新的探索性钻探之后,Ramaco资源进一步规定了砂岩入侵的程度,并实施了替代计划,并在其周围挖掘并升入Pocahontas No. 4缝。 该公司表示,它将继续通过Pocahontas No.3缝的替代路径,预计每年约200,000吨(TPY)。 这些开发吨预计将以当前定价水平销售到低挥发性冶金市场。

著录项

  • 来源
    《Coal Age》 |2018年第7期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 煤矿开采;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号