Simultaneous optimization of ultimate pit and production scheduling using a heuristic approach

机译:使用启发式方法同时优化极限坑和生产调度

获取原文
获取原文并翻译 | 示例
           

摘要

A heuristic model was developed to simultaneously generate the ultimate pit and production scheduling at a mining project. The method consists of a preprocessing step to select a starter pit, the implementation of a genetic algorithm to optimize the pit and schedule of the starter pit, and a network-flow algorithm-based postprocessing operation to finalize the ultimate pit and production scheduling. Applied to an iron ore mine, the model pit and schedule produced a net present value 21% higher than the reference pit and schedule prepared by experienced field engineers.
机译:开发了一个启发式模型,同时在矿业项目中产生最终的坑和生产计划。 该方法包括预处理步骤以选择启动坑,实现遗传算法的实现,以优化起动器坑的凹坑和时间表,以及基于网络流算法的后处理操作,以完成最终的坑和生产调度。 应用于铁矿石矿山,模型坑和时间表产生的净目前值高于参考坑和经验丰富的现场工程师准备的时间表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号