When the level of water reservoirs from Brazilian hydroelectric stations is low, additional thermal plants are turned on to complement the power of the national electric system. The fuels used in these plants are generally natural gas, fuel oil and coal. The objective of this work is to analyze energetically and exergetically a fuel oil thermal plant in operation in Brazil. Real industrial data were used in this analysis. The calculated total work of the turbine is 120.73 MW, which is close to the real value of 120 MW. The cycle energetic efficiency is 36.8% and the exergetic efficiency is 34.4%. The highest exergy destruction was found to be in the boiler (177.11 MW), followed by the high pressure turbine (13.37 MW), due to larger irreversibilities in the processes of these equipment. The exergetic analysis functioned as a complement to the energetic analysis, pointing out where the greatest irreversibilities and improvement potential are: in the boiler.
机译:当巴西水力电站的水库水平较低时,接通额外的热电厂以补充国家电力系统的力量。 这些植物中使用的燃料通常是天然气,燃料油和煤。 这项工作的目的是在巴西运行中积极和高级燃油热厂进行分析。 在该分析中使用了真实的工业数据。 计算出的涡轮机的总工作是120.73mW,接近于120 mW的实际值。 循环精力效率为36.8%,举行效率为34.4%。 发现最高的漏斗被发现在锅炉(177.11 MW)中,其次是高压涡轮机(13.37mW),由于这些设备的过程中的更大的不义。 前进分析作为对能量分析的补充,指出了最大的不可抗拒和改善潜力的位置:在锅炉中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号