...
首页> 外文期刊>Bioenergy insight >WRA warns over hazardous waste wood costs
【24h】

WRA warns over hazardous waste wood costs

机译:WRA警告危险废物木材成本

获取原文
获取原文并翻译 | 示例
           

摘要

The Wood Recyclers’Association(WRA)is seeking waste wood samples from the demolition of buildings built before 2007 in a bid to avert a’potential crisis’that could cost the demolition sector more than £100 million(€117 million)per year.The WRA is appealing to demolition firms to take part in the programme,which is supported by the National Federation of Demolition Contractors(NFDC)to identify which demolition waste wood items are hazardous.Without these tests,the WRA claims the Environment Agency will assume all demolition waste wood from this period is hazardous.As a result,demolition contractors will have to provide evidence that the wood waste is non-hazardous,or pay additional fees to send the material for energy recovery in specialist incinerators.
机译:木材回收商'交配(WRA)正在寻求垃圾样本从2007年之前建造的建筑物的拆除,以避免爆破危机的危机,每年拆除拆迁部门超过1亿英镑(1.17亿欧元)。 WRA呼吁拆迁公司参加该计划,该计划得到全国拆迁承包商联合会(NFDC)支持,以确定哪些拆除废木材物品是危险的。借鉴这些测试,WRA声称环境署将承担所有 从这个时期拆除废木是危险的。结果,拆迁承包商必须提供证据表明木材废物是非危险的,或支付额外费用,以便在专业焚化机中发送能源回收材料。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号