首页> 外文期刊>AACE International Transactions >Infrastructure Cost Planning-Information System for Cost Prediction of Communal Infrastructure
【24h】

Infrastructure Cost Planning-Information System for Cost Prediction of Communal Infrastructure

机译:公用基础设施成本预测的基础设施成本计划信息系统

获取原文
获取原文并翻译 | 示例
           

摘要

As in many industrialized countries, the population of Germany is constantly getting older and smaller nowadays. These demographic changes cause adaptations of technical and social infrastructure in both quality and quantity, to ensure their aspects of economy and usability at long term. Therefore, settlement development planning and municipal infrastructure planning have to work closely together. Decisions like expansion, renovation, re-dimensioning or even closing of municipal infrastructure should be based on long term strategies of settlement development, in order to keep the budget of future remaining costs. As well as development strategies and large new projects have to be evaluated within their infrastructural running costs. A current research project, together with the City of Stuttgart, will enable the planning teams to systematically integrate the consequences of demographic changes in their infrastructural projects in terms of supply quality and cost efficiency. As part of the project, this first study prepares the database of cost indicators for municipal infrastructural project cost estimation in early project phases.
机译:像许多工业化国家一样,如今的德国人口不断老少。这些人口变化导致技术和社会基础设施在质量和数量上都发生了变化,从而确保了其长期的经济性和可用性。因此,居民点发展规划和市政基础设施规划必须紧密合作。诸如扩建,翻新,重新规划甚至关闭市政基础设施之类的决策应基于定居点发展的长期战略,以保持未来剩余成本的预算。以及发展策略和大型新项目都必须在其基础设施运营成本范围内进行评估。当前的研究项目与斯图加特市一起,将使规划团队能够在供应质量和成本效率方面将人口结构变化的后果系统地整合到其基础设施项目中。作为项目的一部分,这项第一项研究为项目初期的市政基础设施项目成本估算准备了成本指标数据库。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号