Managing Multiple Milestones

机译:管理多个里程碑

获取原文
获取原文并翻译 | 示例
           

摘要

This article is a 'must-read' for any Scheduler who has ever had to manage a schedule with multiple contractual milestones. An original technique is offered by the Author that should be in all professional Scheduler's 'toolboxes.' The problem of using a single float value to manage a project with multiple contractual milestones has challenged the best of Schedulers. This paper revisits the issue by taking an entirely new approach to the problem using longest path. A known expert in the use of longest path explains how longest path is the only correct method for determining milestone-controlling activities. The author then proceeds to explain an entirely new way to create Milestone Longest Paths for this crucial measurement using a simple procedure available to everyone. Finally, we list the first-ever, "rules for the proper use of longest path."
机译:对于曾经必须管理具有多个合同里程碑的计划的任何计划程序,本文都是“必读”。作者提供的原始技术应在所有专业Scheduler的“工具箱”中使用。使用单个浮点值来管理具有多个合同里程碑的项目的问题已经对调度程序的最佳性能提出了挑战。本文通过使用最长路径对问题采取全新方法来重新审视此问题。使用最长路径的一位知名专家解释了最长路径是确定里程碑控制活动的唯一正确方法。然后,作者继续解释一种全新的方法,该方法使用每个人都可以使用的简单过程来为此重要测量创建里程碑最长路径。最后,我们列出了有史以来的第一个“正确使用最长路径的规则”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号