Leveraging the Relationship Between the Federal IT Project's Contract Work Breakdown Structure (CWBS) and the Contract's Statement of Work (SOW)

机译:利用联邦IT项目的合同工作分解结构(CWBS)和合同工作说明书(SOW)之间的关系

获取原文
获取原文并翻译 | 示例
       

摘要

Historically, and is often still the case today, the federal Project Manager (PM) is selected based on his or her seniority in the agency and familiarity with the product or service to be procured. This only stands to reason, since who would be in a better position to understand the project's unique requirements and to be aware of the subtle political and social complexities surrounding the project? However, years of field experience is often inadequate to successfully function as today's US federal PM whose duties are becoming increasingly more complex and sophisticated, Not only does the PM still need to thoroughly understand the project requirements and appreciate the social environment in which he or she needs to maneuver, the PM is also expected to be business-savvy and project management certified to a level commensurate with the project.
机译:从历史上讲,直到今天仍然如此,联邦项目经理(PM)是根据其在代理机构中的资历和对要采购的产品或服务的熟悉程度来选择的。这仅是有道理的,因为谁能更好地了解项目的独特要求并了解项目周围细微的政治和社会复杂性?但是,多年的现场经验通常不足以成功地担任今天的美国联邦总理,其职责变得越来越复杂和复杂,不仅总理还需要透彻了解项目要求并了解其所处的社会环境由于需要机动,项目经理还有望精通业务,并获得与项目相称的项目管理认证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号