首页> 外文期刊>Composites Manufacturing >FHWA Seeks Composite Edge for Accelerated Bridges
【24h】

FHWA Seeks Composite Edge for Accelerated Bridges

机译:FHWA为加速桥梁寻求复合材料边缘

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Benjamin Beerman, P.E., senior'structural engineer at the Federal Highway Administration (FHWA), addressed attendees at COMPOSITES 2012 yesterday on the infrastructure market. Beerman doesn't know very much about composites, he builds bridges, but he knows a lot about what products are in demand and how composites could help. The FHWA launched an Everyday Counts Program (EDC) in 2010 and one initiative is to develop faster bridge construction technology using prefabricated bridge elements and systems (PBES). He's interested learning more about composites to bring innovative new solutions to the forefront of bridge technology.
机译:联邦公路管理局(FHWA)的高级结构工程师本杰明·比尔曼(Benjamin Beerman)昨天在2012年COMPOSITES上针对基础设施市场向与会者致辞。比尔曼对复合材料不是很了解,他搭建桥梁,但是他对需求的产品以及复合材料如何提供帮助非常了解。 FHWA于2010年启动了“日常计数计划(EDC)”,其中一项计划是使用预制桥梁元件和系统(PBES)开发更快的桥梁建造技术。他有兴趣学习有关复合材料的更多信息,以将创新的新解决方案带到桥梁技术的最前沿。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号