...
【24h】

PetroChina's Dalian PC plant extends shutdown of wax unit.

机译:中石油的大连PC厂延长了蜡架的关机。

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

As regional wax demand has plummeted because of coronavirus-related lockdowns, PetroChina will keep 20% of the 410K-b/d Dalian PC plant's capacity, including the wax unit, offline after a turnaround that began at the end of May was completed. Lockdown measures in Japan, South Korea, and Thailand have cut into demand in the candles market, which typically peaks at this time of the year. In addition, the facility's exports of fully-refined paraffin wax-with oil content less than 0.75%-decline from 68K mt in March to 33K mt in May. In addition, weak demand has caused storage tanks to reach capacity and export prices to be cut.
机译:由于冠状病毒相关锁定的区域蜡的需求暴跌,石油将保留20%的410k-B / D大连PC厂的能力,包括蜡股,在5月底开始的转变后脱机。 日本,韩国和泰国的锁定措施已切入蜡烛市场的需求,这通常在今年的这个时刻的峰值。 此外,该设施在5月至5月至33K米的68K MT中,全面精制的石蜡 - 含油含量低于0.75%的油含量。 此外,需求疲软导致储罐达到能力和出口价格。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号