首页> 外文期刊>Water Science and Technology >Assessment of uncertainty in discrete fracture network modeling using probabilistic distribution method
【24h】

Assessment of uncertainty in discrete fracture network modeling using probabilistic distribution method

机译:采用概率分布法评估离散断裂网络建模的不确定性

获取原文
获取原文并翻译 | 示例
       

摘要

There have been widespread concerns about solute transport problems in fractured media, e.g. the disposal of high-level radioactive waste in geological fractured rocks. Numerical simulation of particle tracking is gradually being employed to address these issues. Traditional predictions of radioactive waste transport using discrete fracture network (DFN) models often consider one particular realization of the fracture distribution based on fracture statistic features. This significantly underestimates the uncertainty of the risk of radioactive waste deposit evaluation. To adequately assess the uncertainty during the DFN modeling in a potential site for the disposal of high-level radioactive waste, this paper utilized the probabilistic distribution method (PDM). The method was applied to evaluate the risk of nuclear waste deposit in Beishan, China. Moreover, the impact of the number of realizations on the simulation results was analyzed. In particular, the differences between the modeling results of one realization and multiple realizations were demonstrated. Probabilistic distributions of 20 realizations at different times were also obtained. The results showed that the employed PDM can be used to describe the ranges of the contaminant particle transport. The high-possibility contaminated areas near the release point were more concentrated than the farther areas after 5E6 days, which was 25,400 m(2).
机译:关于裂缝介质中的溶质运输问题存在普遍担心,例如,地质骨折岩石中的高级放射性废物处理。逐渐采用粒子跟踪的数值模拟来解决这些问题。使用离散裂缝网络(DFN)模型的放射性废物输送传统预测通常考虑基于裂缝统计特征的裂缝分布的一个特定实现。这显着低估了放射性废物存款评估风险的不确定性。为了在潜在的部位进行DFN建模期间充分评估不确定性,以处理高级放射性废物,本文利用了概率分布法(PDM)。该方法用于评估北山核废料矿床的风险。此外,分析了对仿真结果对仿真结果的影响。特别是,证明了一个实现和多种实现的建模结果之间的差异。还获得了不同时间的20个实现的概率分布。结果表明,所用的PDM可用于描述污染物颗粒转运的范围。释放点附近的高可能污染区域比5e6天后的更远的区域更浓缩,25,400米(2)。

著录项

  • 来源
    《Water Science and Technology》 |2017年第10期|共14页
  • 作者单位

    Chinese Acad Sci Inst Geol &

    Geophys Key Lab Shale Gas &

    Geoengn POB 9825 Beijing 100029 Peoples R China;

    Chinese Acad Sci Inst Geol &

    Geophys Key Lab Shale Gas &

    Geoengn POB 9825 Beijing 100029 Peoples R China;

    Univ Arizona Dept Hydrol &

    Water Resources POB 210011 Tucson AZ 85721 USA;

    Chinese Acad Sci Inst Geol &

    Geophys Key Lab Shale Gas &

    Geoengn POB 9825 Beijing 100029 Peoples R China;

    Chinese Acad Sci Inst Geol &

    Geophys Key Lab Shale Gas &

    Geoengn POB 9825 Beijing 100029 Peoples R China;

    Wuhan Univ State Key Lab Water Resources &

    Hydropower Engn S Wuhan Hubei Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 水资源调2查与水利规划;
  • 关键词

    DFN; fracture; groundwater; probability; uncertainty;

    机译:DFN;骨折;地下水;概率;不确定性;
  • 入库时间 2022-08-19 19:11:24

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号