...
首页> 外文期刊>The TEX Report >FMG’s Chichester Hub Iron Ore Operations to be Powered by Renewable Energy
【24h】

FMG’s Chichester Hub Iron Ore Operations to be Powered by Renewable Energy

机译:FMG的Chichester Hub铁矿石操作由可再生能源提供动力

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In a landmark agreement with Alinta Energy announced today, up to 100 per cent of daytime stationary energy requirements at Fortescue Metals Group’s ( FMG) Chichester Hub iron ore operations will be powered by renewable energy. The Chichester Solar Gas Hybrid project will see the construction of a 60MW solar photovoltaic generation facility at the Chichester Hub, comprising Fortescue’s Christmas Creek and Cloudbreak mining operations. In addition, an approximately 60-kilometre transmission line linking the Christmas Creek and Cloudbreak mining operations with Alinta Energy’s Newman gas-fired power station and a 35MW battery facility will be constructed, with completion due mid- 2021.
机译:在目前宣布的阿内塔能源的标志性协议中,强幻尺金属集团(FMG)奇切斯特枢纽铁矿石运营的最高可达100%的白天静止能量要求将由可再生能源提供动力。 Chichester太阳能燃气混合动力车项目将在Chichester Hub中看到一个60MW太阳能光伏发电设施,包括Fortescue的圣诞小溪和CloudBreak采矿业务。 此外,将建设大约60公里的传输线与Alinta Energy的Newman燃气电站和35MW电池设施连接的Clound Creek和CloudBreak挖掘操作,完成到2021年中期。

著录项

  • 来源
    《The TEX Report》 |2019年第12247期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号