...
首页> 外文期刊>The TEX Report >LW Mining Operation at Moranbah North Coal mine to Restart in Early June
【24h】

LW Mining Operation at Moranbah North Coal mine to Restart in Early June

机译:LW采矿业在莫拉邦北煤矿在6月初重新启动

获取原文
获取原文并翻译 | 示例

摘要

Anglo American plc intends to restart a longwall (LW) mining operation at Moranbah North coal mine in the State of QLD, Australia in early June. At Moranbah North coal mine, the roof collapse accident occurred on 30 January 2020 when the longwall was being relocated. The operation of the said coal mine has been suspended for a long time because of the significantly delayed relocation of the longwall resulted from the accident, as a consequence of which the production volume of metallurgical coal at Moranbah North coal mine in the period from January to March in 2020 dropped to 451,000 tons. This represents a decrease of 1.882 million tons (80.1%) versus the prior period (October to December in 2019).
机译:6月初,英国美国PLC旨在在澳大利亚澳大利亚州澳大利亚州澳大利亚州澳大利亚州莫拉邦北煤矿重新启动Longwall(LW)采矿业务。 在Moranbah北煤矿,屋顶塌陷事故发生于2020年1月30日,当时长墙被重新安置。 由于事故引起的长壁搬迁显着延迟,所以煤矿的运作已被暂停很长一段时间,因此在1月至1日期间的莫拉邦北煤矿冶金煤的生产量 3月2020年下降到451,000吨。 这减少了18.82亿吨(80.1%)与前期(2019年10月至12月)的减少。

著录项

  • 来源
    《The TEX Report》 |2020年第12371期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号