首页> 外文期刊>TEX Energy Report >Stanmore Coal to Expand Raw Coal Production to 7Mtpa
【24h】

Stanmore Coal to Expand Raw Coal Production to 7Mtpa

机译:斯坦莫尔煤将原煤生产扩大到7MTPA

获取原文
获取原文并翻译 | 示例
           

摘要

Stanmore Coal Limited, Australia has a plan to expand the production volume of raw coal to 7Mtpa in the nearfuture by way of exploiting multiple new mining areas. At this stage, 5 million tons of saleable coal will be produced.Stanmore Coal is running Isaac Plains Complex (IP Complex) in the Bowen Basin in the State of QLD.At IP Complex, coals are produced at Isaac Plains open-cut coal mine (IP open-cut coal mine) and Isaac PlainsEast open-cut coal mine (IPE open-cut coal mine). The main type of coal produced at all of both coal mines is semi-softcoking coal, of which the coal reserves at IP open-cut coal mine are depleting, and IPE open-cut coal mine is a flagshipcoal mine of IP Complex at the present moment.
机译:斯坦莫尔煤炭有限公司,澳大利亚计划通过利用多个新的采矿区将原煤生产量扩大到7MTPA。 在这个阶段,将制作500万吨可销售煤。煤炭在QLD的状态下在Bowen盆地中运行ISAAC平原复合物(IP复合物).TIP复合物,煤炭在ISAAC Plains开口煤矿生产 (IP开煤矿)和ISAAC Plapeeast开煤矿(IPE开放式煤矿)。 所有煤矿生产的主要煤炭都是半色煤炭,其中IP开煤矿的煤炭储量是消耗的,IPE开放式煤矿是目前IP综合体的旗舰矿山 片刻。

著录项

  • 来源
    《TEX Energy Report》 |2019年第3768期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号