首页> 外文期刊>Platts Coal Trader International >South Africa’s Eskom extends load shedding, set to have knockon effect on coal demand
【24h】

South Africa’s Eskom extends load shedding, set to have knockon effect on coal demand

机译:南非的ESKOM延长了负荷脱落,设定对煤炭需求的敲击作用

获取原文
获取原文并翻译 | 示例
           

摘要

London—South Africa’s Eskom has extended Stage 2 power outages in the “best efforts to return more generation units to the national grid” and “lessen its impact on morning traffic,” the power utility said in a statement. The cuts, known locally as “load shedding”, were first announced and implemented on July 10 and were expected to last for only one day. The Stage 2 cuts continued through July 11 and July 12. “We have almost reached shut down,” one South African-based analyst said.
机译:伦敦南非的ESKOM延长了2阶段的停电中的停电,以“恢复更多代队到国家网格的最佳努力”和“减少其对早晨交通的影响”,电力效用在一份声明中表示。 在7月10日首次宣布和实施,当地称为“负载脱落”的削减,预计将持续一天。 南非基于分析师表示,第2阶段截至7月11日和7月12日,截至7月12日,截至7月12日。“

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号