首页> 外文期刊>Platts Metals Daily >Canadian miner iamgold 2019 gold output down 13.6% on year
【24h】

Canadian miner iamgold 2019 gold output down 13.6% on year

机译:加拿大矿工IAMGOLD 2019黄金产量下跌13.6%

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

London—Canadian miner Iamgold’s attribut- able 2019 gold production fell 13.6% year on year to 762,000 oz, missing its low end of guidance of 765,000-810,000 oz, with total cash costs at $907/oz produced and all-in sustaining costs at $1,124/oz sold. The Toronto-listed company said late Wednesday fourth-quarter gold production decreased 16.9% year on year to 192,000 oz, with total cash costs at $947/oz produced and all-in sustaining costs $1,161/oz sold.
机译:伦敦加拿大矿工Iamgold的归属于2019年黄金产量同比下降了13.6%至762,000盎司,失去了765,000-810,000盎司的低端,现金成本为907美元/盎司生产,全部持续成本为1,124美元 / oz售出。 多伦多上市公司表示,星期三第四季度黄金产量已故的黄金产量下降了16.9%至192,000盎司,现金成本为947美元/盎司生产,全部持续支付1,161美元/盎司售价。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号