首页> 外文期刊>SBB Steel Markets Daily >ArcelorMittal plans restart of Liberia 15 mil mt/year iron ore concentrate project
【24h】

ArcelorMittal plans restart of Liberia 15 mil mt/year iron ore concentrate project

机译:ArcelorMittal计划重启利比里亚15米米MT /年铁矿石精矿项目

获取原文
获取原文并翻译 | 示例
           

摘要

London—Steel and mining group ArcelorMittal said Nov. 5 it plans to restart an expansion of its Liberia iron ore operation to 15 million mt/ year of concentrate sinter feed in 2021 with a budget of $800 million. ArcelorMittal seeks to produce a premium-grade concentrate switching over from the fourth quarter of 2023 to replace the existing direct shipped ore which has been shipped since 2011, the company said in a Nov. 5 quarterly report. The expansion, when completed, will eventually triple the group's current output from Liberia of unprocessed iron ore fines.
机译:伦敦钢铁和矿业集团ArcelorMittal表示,11月5日该计划在2021年重新启动其利比里亚铁矿石运行至1500万吨/年的浓缩烧结饲料,预算为8亿美元。 该公司在11月5日报告中表示,ArcelorMTAL从2023年第四季度生产出发的高档级浓缩物切换到2023年第四季度,以取代已发货的现有直接发货矿石,该公司在11季度报告中表示。 在完成后,扩展最终将最终三倍三倍于利比里亚的未处理铁矿石罚款的当前产出。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号