首页> 外文期刊>SBB Steel Markets Daily >australia’s nickel mines restarts flood-hit Indonesian Hengjaya mine
【24h】

australia’s nickel mines restarts flood-hit Indonesian Hengjaya mine

机译:澳大利亚的镍矿矿山重启洪水印度尼西亚恒杰矿

获取原文
获取原文并翻译 | 示例
           

摘要

Tokyo—Australia’s Nickel Mines has restarted production at its Hengjaya mine in the Sulawesi island of Indonesia on improved weather conditions, a company said Tuesday. Mine operations were suspended on June 2 after heavy rains and the mine was restarted on Saturday (June 15), its company secretary Richard Edwards said. Production of nickel pig iron at Indonesia Morowali Industrial Park, or IMIP, located 12 kilometers away from the mine, has not been affected, Edwards added.
机译:公司周二表示,东京 - 澳大利亚的镍矿在印度尼西亚苏拉威西岛的恒杰矿开始生产。 矿井运营于6月2日暂停,大雨和矿山于周六(6月15日)重新启动,其公司秘书Richard Edwards表示。 Edwards补充说,在印度尼西亚Monowali工业园区的镍矿工园或Imip,距离矿山12公里,尚未受到影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号