...
首页> 外文期刊>SBB daily eBriefing >A?o Brasil expects Vargem Grande mine to resume in 20 days
【24h】

A?o Brasil expects Vargem Grande mine to resume in 20 days

机译:a?巴西预计瓦尔格德国矿山概要在20天内

获取原文
获取原文并翻译 | 示例
           

摘要

Brazilian miner Vale’s Vargem Grande Complex is expected to resume operations in 20days, Marco Polo de Mello, steel institute A?o Brasil president, said Thursday.“The expectation of resumption for Vargem Grande is between 15 to 20 days,” de Mellosaid at a press conference in Sao Paulo. “Vale is already hiring the US Army Corps ofEngineers ... to be an external certifier of the conditions of the tailings and dams, to thenresume operations,” de Mello said.
机译:巴西矿工Vare的Vargem Grande Complex预计将于周四表示,钢铁研究所(Brasil President)在20天内恢复运营,瑞萨尔总统于周四表示。“Vargem Grande的恢复期望在15至20天之间,”德梅洛伊德 新闻发布会在圣保罗。 “Vale已经聘请了美国陆军队伍的工程师......作为尾矿和水坝条件的外部认证机构,到Thenresume作业,”De Mello说。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号