...
首页> 外文期刊>Natural gas intelligence >Tellurian Cuts Driftwood LNG Costs, Defers Haynesville Supply Pipeline
【24h】

Tellurian Cuts Driftwood LNG Costs, Defers Haynesville Supply Pipeline

机译:Tellurian Difs Driftwood LNG成本,叛逃隼鸟田府供应管道

获取原文
获取原文并翻译 | 示例

摘要

Tellurian Inc. said this week it has cut costs for the frst phase of the proposed 27.6 million metric ton/year (mmty) Driftwood liquefed natural gas (LNG) export terminal as it works toward sanctioning the massive project in a weak global market. The Houston-based operator indicated in an investor presentation on Wednesday that it would achieve a portion of the savings by deferring plans for three of the four pipe- lines proposed to feed the facilities.
机译:Tellurian Inc.本周表示,它已经降低了拟议的2760万公吨/年(MAY)Driftwood液化天然气(LNG)出口终端的FRST阶段的成本,因为它旨在在全球弱势市场中制裁大规模项目。 休斯顿的运营商于周三在投资者介绍中指出,通过推迟为养殖设施的四条管道中的三条管道计划实现一部分节省。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号