首页> 外文期刊>Metal Bulletin Daily >Accident at China’s Huaxing alumina refinery removes 50-80kt of supply; market unmoved so far
【24h】

Accident at China’s Huaxing alumina refinery removes 50-80kt of supply; market unmoved so far

机译:中国华兴氧化铝炼油厂的事故删除了50-80kt的供应; 到目前为止,市场无动于衷

获取原文
获取原文并翻译 | 示例
           

摘要

Huaxing alumina refinery, in Shanxi province of northern China, has closed one alumina production line following an equipment accident, several sources told Fastmarkets on Monday June 29. It could take 20-30 days to return the production line to full operation, removing around 50,000-80,000 tonnes of alumina supply from the Chinese domestic market over the period, according to market estimates. Huaxing alumina refinery, co-funded by Aluminum Corp of China (Chalco) and China Resources (Holdings) Co in 2010, has full production capacity of 2.2 million tonnes per year alumina. It had been operating at 1 million tpy until the beginning of June, when it resumed its idled 1.2 million tpy to bring it to full capacity. Huaxing alumina refinery could not be reached for comment on June 29.
机译:华兴氧化铝炼油厂,在山西省北方山西省,在设备事故中关闭了一条氧化铝生产线,几个来源在6月29日星期一告诉Fastmarkets。它可能需要20-30天才能将生产线恢复到全运行,从而左右左右去除50,000 根据市场估计,中国国内市场的8.8万吨氧化铝供应。 华兴氧化铝炼油厂由中国(Chalco)和中国资源(Holdings)Co的铝合金(Chalco)和中国资源(Holdings)CO共同资助,每年拥有220万吨的全部生产能力。 它一直在6月初运营,直到6月初,当它恢复其空闲120万TPY以使其充分能力。 华兴炼油厂于6月29日无法达成评论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号