...
首页> 外文期刊>McCloskey s Coal Report >Tribunal blocks building of Kenya's first coal-fired power plant
【24h】

Tribunal blocks building of Kenya's first coal-fired power plant

机译:肯尼亚第一个燃煤电厂的法庭街区建设

获取原文
获取原文并翻译 | 示例
           

摘要

A Kenyan tribunal has blocked the construction of the country’s first coal-fired power plant, saying authorities have not conducted enough environmental studies on the project’s potential impact. Amu Power Limited, a joint venture between Centum Investment and Gulf Energy, aims to build a 1,050 MW coal-fired power plant, but its proposed location near a UNESCO World Heritage area in Lamu has sparked community protests. The power plant, if built, is expected to burn mainly imported South African thermal coal until domestic supplies become available. Typically, a 1 GW plant takes around 2 mt/y of 6,000 kc NAR basis material.
机译:肯尼亚法庭阻止了该国第一家燃煤电厂的建设,称当局没有对项目的潜在影响进行了足够的环境研究。 AMU Power Limited是一名上升机和海湾能源之间的合资企业,旨在建立1,050兆瓦的燃煤电厂,但其拟议的位置靠近拉莫的联合国教科文组织世界遗产地区的抗议活动。 电厂,如果建造,预计将主要燃烧南非热煤,直至国内供应现有。 通常,1 GW植物需要6,000千万kc基材的2mt / y。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号