...
首页> 外文期刊>European Journal of Operational Research >Combined optimisation of an open-pit mine outline and the transition depth to underground mining
【24h】

Combined optimisation of an open-pit mine outline and the transition depth to underground mining

机译:结合露天矿轮廓的优化和过渡深度到地下挖掘

获取原文
获取原文并翻译 | 示例
           

摘要

Miners harvest minerals from ore-bodies in the ground by a variety of specialised mining methods, with most falling into the categories of open-pit and underground. Some ore-bodies are harvested by a combination of open-pit and underground methods. In these cases there is often material that could be mined by either method, and an economic choice has to be made. This is referred to as the transition problem and it has received some attention in the mining literature since the 1980s and more recently has had attention in the mathematics literature. The transition problem is complicated by the need in many cases to leave a crown pillar (un-mined rock above the underground mine) and for this crown pillar to have a prescribed shape.
机译:矿工通过各种专业的采矿方法从地面上收获矿物质,大部分落入露天和地下的类别。 一些矿体由露天坑和地下方法的组合收获。 在这些情况下,通常可以通过任一方法开采材料,并且必须进行经济选择。 这被称为过渡问题,自20世纪80年代以来,它在矿业文献中得到了一些关注,最近在数学文献中受到关注。 在许多情况下,过渡问题使得在许多情况下留下一个冠支柱(未开采地下矿井的岩石)以及该冠支柱具有规定的形状。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号