Norway’s Petroleum Safety Authority (PSA) has given Aker BP consent to perform modifications relating to gas lift at the Tambar field. “The gas lift project is part of a major field development project at Tambar. The field development project involves a drilling campaign of two new wells (see story below), gas lift for existing and new wells, an operating life extension, and some minor modifications,” said the PSA.
展开▼