Wood is delivering “a multimillion-dollar engineer- ing design project” for Chevron’s Anchor deepwa- ter development in the US Gulf of Mexico (GoM). The work scope of the project included the Preliminary Front End Engineering and Design (Pre-FEED), FEED and now includes detailed design of Anchor, a wet tree development that will employ a semi-submersible Floating Production Unit (semi-FPU), Wood said.
展开▼