...
首页> 外文期刊>Argus FSU energy >Gazpromneft updates on promising Chonsk
【24h】

Gazpromneft updates on promising Chonsk

机译:关于有前途的Chonsk的Gazpromneft更新

获取原文
获取原文并翻译 | 示例
           

摘要

Gazpromneft has completed the second horizontal well at its Ignyalinskoye feld in east Siberia - part of the 1.6bn bl Chonsk project - before the planned start of pilot development next year. The well, with 10-stage fracking, yielded over 250 t/d (1,300 b/d) - twice as much as the frst horizontal well drilled last year - reafrming the commercial potential of the three-feld Chonsk project. The Ignyalinskoye, Vakunaiskoye and Tympuchikanskoye felds have combined estimated reserves of 1bn t (7.3bn bl).
机译:Gazpromneft在东西伯利亚的Ignyalinskoye Feld完成了第二个水平井 - 1.6亿BL Chonsk项目的部分 - 在明年计划开始试点发展之前。 井有10级的压裂,超过250吨/平(1,300b / d) - 去年钻井横向钻井的两倍 - Reafring三英属核心纪录项目的商业潜力。 Ignyalinskoye,Vakunaiskoye和Tympuchikanskoye Felds的估计储量为1bn t(7.3bn bl)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号