...
首页> 外文期刊>Argus Global Markets >new stream launches but decline continues
【24h】

new stream launches but decline continues

机译:新流发射,但继续下降

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The launch of a new Angolan crude stream is unlikely to stem the country’s slump- ing production, which is on course to fall to its lowest in over a decade. The frst cargoes from Total’s 230,000 b/d Kaombo deepwater project are scheduled for September, a loading programme shows. The schedule lists three 950,000 bl cargoes of Gindungo loading on 4-5 September, 17-18 September and 29-30 September. Gindungo is one of six felds that make up the block 32 proj- ect. Total said on 27 July that production had started at the project at a rate of 115,000 b/d and will increase to 230,000 b/d next year when a second foating production, storage and ofoading (FPSO) vessel begins operations.
机译:新的安哥拉粗物流的推出不太可能阻止该国的坍塌生产,这当然是在十年内降至最低。 来自九月的加载计划显示,来自230,000 B / D Kaombo Deepwwater项目的FRST货物。 该时间表列出了9月4日至17日和9月29日至30日9月4日至5日的吉宁戈装载的三个950,000 BL货物。 Gindungo是六个装备32楼的FELD之一。 总计在7月27日表示,该项目以115,000 B / D的速度在该项目开始,将于明年增加到230,000 B / D当第二次发出生产,储存和船舶(FPSO)船舶开始运营时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号