首页> 外文期刊>Argus Coal Daily International >Indonesia’s Adaro Energy lifts output in 2018
【24h】

Indonesia’s Adaro Energy lifts output in 2018

机译:印度尼西亚的Adaro Energy Lifts 2018年输出

获取原文
获取原文并翻译 | 示例
           

摘要

Indonesian coal producer Adaro Energy produced 54.04mn t in 2018, up by 4pc on the previous year, and hit its targets after a significant increase in production in the fourth quarter. The company’s output was in the lower range of its target of 54mn-56mn t for the year and exceeded 2017 production of 51.8mn t. Adaro was able to reach its target because fourthquarter production rose to 15.06mn t, up by 21pc against 12.43mn t in the final quarter of 2017. The company attributed the increase to comparatively better weather conditions in the fourth quarter of 2018 compared with the previous year. Its fourth-quarter 2017 operations were hampered by severe rains, with record-setting average rain hours and rainfall volume, Adaro said. While fourth-quarter 2018 was also a wet season for the company, it was milder compared with the previous year.
机译:印度尼西亚煤炭生产者ADARO能源于2018年生产了54.04Mn T,上年增长4PC,并在第四季度的产量大幅增加后击中其目标。 该公司的产量在其目标的较低范围内为54mn-56mn T,超过2017年生产5180万吨。 Adaro能够达到其目标,因为第四次产量增长至15.06亿吨,2017年最后季度增长21倍以上。该公司与上一季度的第四季度归因于2018年第四季度的相对更好的天气状况。 年。 阿加罗说,其第四季度2017年第四季度业务受到严重降雨的阻碍,记录设定平均下雨时间和降雨量。 虽然2018年第四季度也是该公司的潮湿季节,但与上一年相比,它更加温和。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号