首页> 外文期刊>Water Science and Technology >Mechanical pre-treatment (MPT) - revitalised by MBR process
【24h】

Mechanical pre-treatment (MPT) - revitalised by MBR process

机译:机械预处理(MPT)-通过MBR流程焕发活力

获取原文
获取原文并翻译 | 示例
           

摘要

Since the mid-nineties membrane bioreactor (MBR) technology has been introduced to municipal wastewater treatment in Europe. The first MBR plants went into operation performing a conventional mechanical pre-treatment (MPT) without any advanced treatment units. After a short operation period, clogging caused by fibrous substances and hence module sludging was observed. Thus, MPT was upgraded introducing sieves. Several investigations had been carried out to determine the removal efficiency of different sieve units and entire MPT systems. Meanwhile experiences from long-term operation at different MBR sites indicate dependencies between different MPT units, especially between the aerated grit chamber/grease trap and the subsequent sieve unit, Usually the sieve is the final MPT unit and its performance depends on the performance of the upstream MPT units. This report describes and discusses results from a research project at MBR Kaarst-Nordkanal in Germany conducted in 2008 to 2010 by the Water Board of River Erft and the Department of Sanitary and Environmental Engineering. Main focus is addressed for the parameters SS (settable solids) and grease. One major experience is the confirmation of relevant interactions between the grit chamber and the downstream sieve unit. Stable operation of the grit chamber and grease trap is essential to achieve a constantly high removal performance of the sieve unit and therefore the entire MPT stage, In turn, negative impacts on the grit chamber performance from the return flow concept have to be avoided. Finally, it is shown that the appropriate two-dimensional sieve gap size should not go beyond 1 mm when operating hollow fibre membranes.
机译:自90年代中期以来,膜生物反应器(MBR)技术已被引入欧洲的市政废水处理中。首批MBR工厂投入运行,无需任何高级处理装置即可进行常规机械预处理(MPT)。在短时间的操作后,观察到由纤维状物质引起的堵塞,并因此观察到模块的淤塞。因此,MPT进行了升级,引入了筛子。为了确定不同筛子单元和整个MPT系统的去除效率,已经进行了几次研究。同时,在不同MBR位置长期运行的经验表明,不同的MPT单元之间存在依赖性,尤其是充气砂砾室/油脂收集器与后续的筛子单元之间。通常,筛子是最终的MPT单元,其性能取决于MPT的性能。上游MPT单位。本报告描述并讨论了2008年至2010年在德国MBR Kaarst-Nordkanal进行的一项研究项目的结果,该项目由Erft河水务局和卫生与环境工程部进行。主要关注参数SS(可固化固体)和润滑脂。一个主要的经验是确认了沉砂室和下游筛网单元之间相关的相互作用。砂砾室和油脂捕集器的稳定运行对于实现筛网单元以及整个MPT阶段的持续高去除性能至关重要,因此,必须避免回流概念对砂砾室性能产生负面影响。最后,表明在操作中空纤维膜时,合适的二维筛孔尺寸不应超过1 mm。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号