首页> 外文期刊>The TEX Report >Rio Tinto To Further Inject 3.1-B US dollars In WA Iron Ore Operations- Aiming to establish 283 Mtpa infrastructure capacity by end 2013 -
【24h】

Rio Tinto To Further Inject 3.1-B US dollars In WA Iron Ore Operations- Aiming to establish 283 Mtpa infrastructure capacity by end 2013 -

机译:力拓将向西澳铁矿石业务进一步注资3.1-B美元-旨在在2013年底之前建立283 Mtpa基础设施产能-

获取原文
获取原文并翻译 | 示例
           

摘要

Rio Tinto announced October 20 that it will invest a further 3.1 billion US dollars (Rio Tinto share 2.1 billion dollars) in expanding its iron ore infrastructure in the Pilbara, Western Australia. This investment will increase infrastructure capacity at and for its shipping ports - Dampier and Cape Lambert - to a total of 283 million tonnes per annum (Mtpa) by the end of 2013. Further investments will be required to achieve production of 283 Mtpa, such as mine and housing expansions, the approval of which is anticipated within the next 12 months. Rio Tinto has also approved meanwhile a final feasibility study into increasing Pilbara production capacity to 333 Mtpa.
机译:力拓10月20日宣布,将再投资31亿美元(力拓持股21亿美元),以扩大其在西澳大利亚州皮尔巴拉的铁矿石基础设施。这项投资将在2013年底之前将其丹皮尔港和兰伯特角港等港口的基础设施产能提高到总计每年2.83亿吨(Mtpa)。将需要进一步投资以实现283 Mtpa的产量,例如矿山和房屋扩建,预计将在未来12个月内获得批准。力拓(Rio Tinto)同时还批准了一项最终可行性研究,以将皮尔巴拉(Pilbara)生产能力提高到333 Mtpa。

著录项

  • 来源
    《The TEX Report》 |2010年第22期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号