...
首页> 外文期刊>The TEX Report >PT Inco / Indonesia Produced 19,811 Tons Of Ni In Nickel Matte In Jan. - Mar. 2010- Increased By 16% Compared To That In Q4 / 09, Increased Shipments Caused Improvement of Sales
【24h】

PT Inco / Indonesia Produced 19,811 Tons Of Ni In Nickel Matte In Jan. - Mar. 2010- Increased By 16% Compared To That In Q4 / 09, Increased Shipments Caused Improvement of Sales

机译:PT Inco /印尼于2010年1月至3月以镍雾面生产19,811吨镍-与09/4季度相比增加16%,出货量增加导致销售改善

获取原文
获取原文并翻译 | 示例
           

摘要

PT Inco of Indonesia released on the 6th of May their production activities of nickel matte in the first quarter ( January - March ) of 2010. According to this report, PT Inco produced 19,811 tons ( 43.7 million lbs. ) of Ni in nickel matte in January - March quarter of 2010, having increased by 16.3% compared with that ( 17,029 tons = 37.5 million lbs. ) in the preceding quarter of October - December of 2009. This increase was mainly due to higher actual output aided by the rescheduling of a roof repair to one of electric furnaces, which moved to the second quarter of 2010 from the first quarter. This repair was implemented from the 5th of April and completed on the 19th but is supposed to influence somewhat on production of nickel matte in April - June quarter.
机译:印度尼西亚PT Inco于5月6日发布了其2010年第一季度(1-3月)的哑光镍生产活动。根据该报告,PT Inco在2008年的哑光镍中生产了19,811吨(4,370万磅)的镍。 2010年1月至3月季度,与2009年10月至2009年12月的前季度(17029吨= 3750万磅)相比增长了16.3%。这一增长主要是由于重新安排了A的实际产量所致其中一个电炉的屋顶维修从第一季度移至2010年第二季度。该修理从4月5日开始实施,并于19日完成,但应该会对4月至6月季度的雾面镍生产产生一定影响。

著录项

  • 来源
    《The TEX Report》 |2010年第may11期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号