...
首页> 外文期刊>The Northern Miner. >Peregrine eyes first production by 2021
【24h】

Peregrine eyes first production by 2021

机译:到2021年,百富勤将首批生产

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Peregrine Diamonds (TSX: PGD] hopes to have its Chidliak project producing diamonds by 2021, as outlined in a preliminary economic assessment (PEA) released in July. Chidliak sits 120 km northeast of Iqa-luit, the capital of Nunavut, on Canada's Baffin Island. The study, which pegged capital costs at $435 million, projects Chidliak's net present value at a pleasant $471-million, with an internal rate of return of 29.8% (after taxes and at a 7.5% discount rate]. The operation would produce 1.2 million carats annually, with production peaking at 1.8 million carats per year. According to the study, Chidliak could generate a 72% operating margin, with pre-tax average annual free cash flows of $131 million. The company's five-year time line to production assumes feasibility-level scoping work next year, while permitting would conclude in time for development in mid-2019. The construction schedule would see the mine enter commissioning, and then production, in 2021.
机译:如7月份发布的初步经济评估报告(PEA)所述,Peregrine Diamonds(TSX:PGD)希望其Chidliak项目能够在2021年之前生产钻石。Chidliak位于加拿大巴芬(Baffin)努纳武特(Nunavut)首府伊卡·路易(Iqa-luit)东北120公里。 Island。该研究的资本成本为4.35亿美元,预计Chidliak的净现值为4.71亿美元,内部收益率为29.8%(税后,折现率为7.5%)。该研究表明,Chidliak的年产量为120万克拉,最高产量为每年180万克拉,根据该研究,其经营利润率为72%,税前平均年度自由现金流为1.31亿美元。生产将在明年进行可行性级别的范围界定工作,而许可将在2019年中期按时完成开发,施工时间表将使矿山开始调试,然后在2021年投入生产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号