首页> 外文期刊>CRU monitor: Nickel Chrome Molybdenum >Production disruptions persist
【24h】

Production disruptions persist

机译:生产中断持续存在

获取原文
获取原文并翻译 | 示例
           

摘要

Following delays to the start-up dates for both Ravensthorpe and Goro, there are no major new greenfield projects due on-stream this year that will yield refined nickel, leaving the industry reliant on existing operations and a handful of brownfield expansions. In the first quarter, there is potential for a modest 2.8 percent year-on-year increase in output but this assumes that the level of unforeseen disruption, which has severely constrained growth in the last two years, amounts to no more than 10,000t.
机译:由于拉文斯索普(Ravensthorpe)和戈罗(Goro)的启动日期都推迟了,今年没有新的重大新项目投产,而这些项目将生产精炼镍,从而使该行业依赖于现有业务和少量棕地扩建。在第一季度,产量有可能同比略微增长2.8%,但这是基于不可预见的中断水平,该水平在过去两年中严重限制了经济增长,不超过10,000吨。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号