首页> 外文期刊>Platt's Oilgram News >Chevron begins to fill Colorado-Utah oil pipeline
【24h】

Chevron begins to fill Colorado-Utah oil pipeline

机译:雪佛龙公司开始填充科罗拉多-犹他州的石油管道

获取原文
获取原文并翻译 | 示例
       

摘要

New York-As Chevron moved toward normalizing operations on its 45,000 b/d Colorado-Utah Rangely crude pipeline February 1, Salt Lake City officials said they have asked the company to study relocating parts of pipeline that wrap around environmentally sensitive areas. "The mayor is incredibly concerned with where the pipeline runs through," spokeswoman Lisa Harrison Smith said in a telephone interview. Harrison Smith said there are five different points that city and county officials believe are environmentally sensitive, including around a watershed area, creeks and valleys.
机译:2月1日,盐湖城官员表示,雪佛龙公司正朝其45,000桶/日的科罗拉多-犹他州Rangely原油管道的正常运营迈进,盐湖城的官员表示,他们已要求该公司研究重新包装围绕环境敏感地区的部分管道。女发言人丽莎·哈里森·史密斯(Lisa Harrison Smith)在电话采访中说:“市长非常担心管道的贯通位置。”哈里森·史密斯说,市和县官员认为有五个不同的方面对环境敏感,包括流域,小溪和山谷周围。

著录项

  • 来源
    《Platt's Oilgram News》 |2011年第23期|共1页
  • 作者

    Leslie Moore Mira;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-19 14:23:39

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号