首页> 外文期刊>Platt's Oilgram News >Lack of rigs may delay drilling at Cepu oil block
【24h】

Lack of rigs may delay drilling at Cepu oil block

机译:缺少钻机可能会延迟在Cepu油区的钻井

获取原文
获取原文并翻译 | 示例
       

摘要

Pertamina and ExxonMobil might have to delay drilling on their jointly-held Cepu oil block in East Java from September this year to early 2007 due to a shortage of available rigs,a senior official of the Indonesian state-owned company said April 6."We may delay our initial drilling plan from around September/October this year to early 2007 because of a rig shortage.We are having trouble finding a rig.However,if we find a rig,we will start drilling based on our initial plan," Pertamina Vice President lin Arifin Takhyan said.
机译:印尼国有公司高级官员4月6日说,由于缺乏可用的钻机,Pertamina公司和埃克森美孚公司可能不得不将他们在东爪哇省共同拥有的Cepu石油区块的钻探工作从今年9月推迟到2007年初。由于钻机短缺,我们可能会将我们的初始钻探计划从今年9月/十月推迟到2007年初。我们在寻找钻机方面遇到了麻烦。但是,如果找到钻机,我们将根据我们的初始计划开始钻探。”副总统林·阿里芬·塔赫扬说。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号