首页> 外文期刊>Metal Bulletin >STEEL EYES 2 MILLION TPY HRC AT EX-HANBO PLANT DANGJIN
【24h】

STEEL EYES 2 MILLION TPY HRC AT EX-HANBO PLANT DANGJIN

机译:前韩博工厂钢眼200万吨/年热轧卷

获取原文
获取原文并翻译 | 示例
           

摘要

The 1.8 million tpy plant resumed operations in May while the 2 million tpy unit is only 56 percent complete. Once that unit is completed in October 2006, it will have capacity of 3 million tpy, said the spokesman. The second stage would see INI building a second blast furnace and another 3.5 million tpy upstream facility. By this time, it would be producing 7 million tpy of upstream steel products, but only 5 million tpy of HRC, hence the need either to build a new HRC plant or expand the existing HRC units to compensate for the 2 million tpy shortfall, the spokesman said
机译:年产180万吨的工厂于5月恢复运营,而年产200万吨的装置仅完成了56%。发言人说,该装置于2006年10月建成后,将具有300万吨/年的生产能力。在第二阶段,INI将建造第二座高炉和另外350万吨的上游设施。到那时,它将生产700万吨的上游钢铁产品,但仅生产500万吨的热轧卷,因此需要建立一个新的热轧卷工厂或扩大现有的热轧卷装置来弥补200万吨的不足,发言人说

著录项

  • 来源
    《Metal Bulletin》 |2005年第8910期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号