【24h】

Work continues at OCI Iowa Fertilizer plant

机译:OCI爱荷华州化肥厂的工作仍在继续

获取原文
获取原文并翻译 | 示例
           

摘要

Wever, Iowa—Despite a change of subcontractors at the Wever, Iowa, work site, OCI NV's Iowa Fertilizer Co. reiterated last week that actual work at the site never stopped.. Earlier local press reports had indicated that work may have come to a halt - OCI said that was not the case. According to the company, on Friday, April 17,2015, Orascom E&C USA Inc., the engineering, procurement, and construction (EPC) contractor, reassigned all work that was being carried out by one of its subcontractors to three other subcontractors, all of which have existing onsite experience, in order to improve construction supervision and productivity.
机译:爱荷华州韦弗—尽管在爱荷华州韦弗的工作地点更换了分包商,但OCI NV的爱荷华肥料公司上周重申,该地点的实际工作从未停止。暂停-OCI表示并非如此。据该公司称,2015年4月17日星期五,工程,采购和建筑(EPC)承包商Orascom E&C USA Inc.将其分包商之一正在进行的所有工作重新分配给其他三个分包商,所有其中已有现场经验,以提高施工监督和生产率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号