首页> 外文期刊>E&P daily >KBR bags Bonaparte design
【24h】

KBR bags Bonaparte design

机译:KBR包Bonaparte设计

获取原文
获取原文并翻译 | 示例
           

摘要

KBR has been selected by GDF SUEZ and partner Santos to undertake the design work for the Bonaparte Floating LNG (FLNG) vessel that will operate 250km offshore Darwin, Australia - with the win qualifying KBR as a bidder for the engi- neering, procurement and construction (EPC) phase that will follow. "This award is one of two contracts being let by GDF SUEZ as part of an initial concept definition design competition for the vessel. The award also pre-qualifies KBR as a contender for the EPC delivery phase of the project. The concept defini- tion work is already underway in KBR's London operations centre in Leatherhead, and is expected to last up to 12 months," said KBR.
机译:GDF SUEZ和合作伙伴Santos选择了KBR来进行Bonaparte浮动LNG(FLNG)船的设计工作,该船将在澳大利亚达尔文市外250公里处运营-获胜的KBR可作为工程,采购和建造的投标人(EPC)阶段。 “该奖项是GDF SUEZ作为该船初始概念定义设计竞赛的一部分而签订的两份合同之一。该奖项还使KBR成为该项目EPC交付阶段的有力竞争者。该概念的定义KBR位于莱瑟黑德的伦敦运营中心已经开始进行这项工作,预计将持续12个月。”

著录项

  • 来源
    《E&P daily》 |2012年第9期|共1页
  • 作者

    Eamp; P daily Group;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号